Case Studies
Dorád Power Plant, Ashkelon
Wood Group GTS was awarded the contract to build the Dorad 800 MW Power Plant in Ashkelon, Israel.
A 14-cell counterflow pultruded fiberglass cooling tower cooling seawater was chosen to condense the steam turbine.
YWCT partnered with SPIG to erect the cooling tower on site.
The structure (m100 long, m24 wide) was erected in less than six months.
![](/wp-content/uploads/2018/12/year.png)
Year
2013![](/wp-content/uploads/2018/12/construction.png)
Construction
Pultruded Fiberglass![](/wp-content/uploads/2018/12/water-flow.png)
Water flow
52,000 m³/hr![](/wp-content/uploads/2018/12/industries.png)