Dorád Power Plant, Ashkelon

Dorad_Power_Plant_Ashkelon_img_1Dorad_Power_Plant_Ashkelon_img_2Dorad_Power_Plant_Ashkelon_img_3
Power Power

Wood Group GTS was awarded the contract to build the Dorad 800 MW Power Plant in Ashkelon, Israel.

A 14-cell counterflow pultruded fiberglass cooling tower cooling seawater was chosen to condense the steam turbine.

YWCT partnered with SPIG to erect the cooling tower on site.

The structure (m100 long, m24 wide) was erected in less than six months.

Year

2013

Construction

Pultruded Fiberglass

Water flow

52,000 m³/hr

Industry

Power