ПРИМЕРЫ РАБОТ

Agán Chemicals, Ashdod

Agán_Chemicals_Ashdod_img_1Agán_Chemicals_Ashdod_img_2Agán_Chemicals_Ashdod_img_3

Yerushalmi was commissioned to replace old cooling towers installed

by us 30 years ago. The old towers, standing in cement pools, were of the cross-flow type;

to enable the cooling tower output to be increased while making full use of the available area,

the replacement towers were designed to operate on the reverse-flow principle,

and to fit the existing concrete pools perfectly. In order to minimize production downtime,

the cooling towers were constructed at our plant and delivered to the site in sections.

When all the parts were ready, our teams dismantled the old

cooling towers in less than five days; a further three days were then required to set up the

new cooling towers at their designated locale.

Год

2013

Материал

Galvanized steel

Расход воды

2,400 m³/hr

Отрасль

Chemical

Давайте

останемся на связи

Приглашаем Вас задавать вопросы, консультироваться и поддерживать связь

нажми сюда