ПРИМЕРЫ РАБОТ

Siemens Alon Tavor Power Plant

Siemens_Alon_Tavor_Power_Plant_img_1Siemens_Alon_Tavor_Power_Plant_img_2Siemens_Alon_Tavor_Power_Plant_img_3Siemens_Alon_Tavor_Power_Plant_img_4Siemens_Alon_Tavor_Power_Plant_img_5
Power Power

The Austrian branch of Siemens was awarded a contract to build Alon Tavor 70 MW power plant. YWCT was chosen to design and build the auxiliary cooling tower required for this project. One of our modular FRPP models was selected for the job. The cooling tower, made of pultruded FRP, was built in our premises, tested by Siemens QA team and sent to the job site in modules which were assembled in five days of work. In order to save space, the cooling tower was positioned over an elevated basin under which the pumps and water treatment systems were installed. The colour of the cooling towers was selected by the customer so it would fit local flora and scenery.

Год

2018

Материал

Modular pultruded FRP

Расход воды

1,060 m³/hr

Отрасль

Power

Давайте

останемся на связи

Приглашаем Вас задавать вопросы, консультироваться и поддерживать связь

нажми сюда