ПРИМЕРЫ РАБОТ
Zaporizhye Steel III
YWCT was awarded with a contract to design and deliver a cooling tower for a steel mill in Ukraine. The cooling tower was designed to fit an existing basin which was revamped for this purpose and was conceived of five cells (two + three), m12Xm12 each. Erection was conducted locally in less than three months, just in time before cold winter (up to -35Co) was coming.

Год
2018
Материал
Pultruded FRP
Расход воды
11,000 m³/hr
Отрасль
Metal industryДавайте
останемся на связи
Приглашаем Вас задавать вопросы, консультироваться и поддерживать связь
нажми сюда