Zaporizhye Steel III
YWCT was awarded with a contract to design and deliver a cooling tower for a steel mill in Ukraine. The cooling tower was designed to fit an existing basin which was revamped for this purpose and was conceived of five cells (two + three), m12Xm12 each. Erection was conducted locally in less than three months, just in time before cold winter (up to -35Co) was coming.
![](/wp-content/uploads/2018/12/year.png)
Год
2018![](/wp-content/uploads/2018/12/construction.png)
Материал
Pultruded FRP![](/wp-content/uploads/2018/12/water-flow.png)
Расход воды
11,000 m³/hr![](/wp-content/uploads/2018/12/industries.png)
Отрасль
Metal industryДавайте