ПРИМЕРЫ РАБОТ

Siemens Ramat Gavriel Power Plant

Siemens_Ramat_Gavriel_Power_Plant_img_1Siemens_Ramat_Gavriel_Power_Plant_img_2Siemens_Ramat_Gavriel_Power_Plant_img_3Siemens_Ramat_Gavriel_Power_Plant_img_4Siemens_Ramat_Gavriel_Power_Plant_img_5Siemens_Ramat_Gavriel_Power_Plant_img_6
Power Power

The Austrian branch of Siemens was awarded a contract to build Alon Tavor 70 MW power plant. YWCT was chosen to design and build the auxiliary cooling tower required for this project. One of our modular FRPP models was selected for the job. The cooling tower, made of pultruded FRP, was built in our premises, tested by Siemens QA team and sent to the job site in modules which were assembled in five days of work. In order to save space, the cooling tower was positioned over an elevated basin under which the pumps and water treatment systems were installed. The entire design of the cooling tower was made in light of the extremely strict noise requirements of the customer. The revolving system was designed to turn slowly, equipped with ultra quiet fans to meet these requirements.

Год

2018

Материал

Modular pultruded FRP

Расход воды

1,060 m³/hr

Отрасль

Power

Давайте

останемся на связи

Приглашаем Вас задавать вопросы, консультироваться и поддерживать связь

нажми сюда