Makhteshim Chemical Works

Makhteshim_Chemical_Works_img_1Makhteshim_Chemical_Works_img_2Makhteshim_Chemical_Works_img_4

As part of this major chemical manufacturer’s expansion, YWCT was invited to bid on a 1,600 m³/hr cooling tower.

The timetable was very narrow. As its solution, YWCT offered a dual-cell tower made of FRP. Pultruded parts were cut and drilled to fit in the US,and then delivered directly to the site.

The tower was erected on site in record time.

Year

2009

Construction

Pultruded FRP

Water flow

1,600 m³/hr

Industry

Chemical