Nesher Power Plant

Nesher_Power_Plant_29_img_1Nesher_Power_Plant_29_img_2Nesher_Power_Plant_29_img_3Nesher_Power_Plant_29_img_4Nesher_Power_Plant_29_img_5
Power Power

Nesher is one of Israel’s largest cement manufacturers.

Its power plant required a heavy-duty cooling tower due to conditions at Nesher’s site, which is full of corrosive dust.

A dual-cell pultruded FRP tower over a concrete basin was designed and built.

Year

2008

Construction

Pultruded FRP

Water flow

2,000 m³/hr