Case Studies
Trane, Nigeria
Trane Nigeria committed to supply air conditioning system to one of the leading banks in Lagos. The cooling towers for the water cooled chillers were designed to be positioned in the parking lot of the building. YWCT designed four units of cross flow cooling tower in forced draft appearance with total height of less than 2.1m. The towers were shipped in two standard 40” containers to be installed successfully on site.