Ben-Gurion International Airport
In 1999, YWCT was asked to plan and build a cooling tower for the new terminal at Ben-Gurion Airport (TLV).
A concrete basin elevated from the ground was designed. The basin’s height increased the efficiency of the pumps; and the space under the basin is utilized for storage.
An HDG structure covered with pultruded FRP was erected over the basin
![](/wp-content/uploads/2018/12/year.png)
Year
2000![](/wp-content/uploads/2018/12/construction.png)
Construction
FRP and HDG![](/wp-content/uploads/2018/12/water-flow.png)
Water flow
3,600 m³/hr![](/wp-content/uploads/2018/12/industries.png)