Beyond Tower

Electra Systems was awarded the contract to supply the cooling and air-conditioning systems for Beyond Tower, a landmark high-rise currently under construction in Tel Aviv. The cooling towers were specifically engineered for installation on concrete basins at the top of the skyscraper, at an elevation of 300 meters. Our company was entrusted with the design, manufacturing, and delivery of three cooling towers, all prefabricated at our facility, hoisted to the top of the tower, and successfully installed on the concrete basins. The project highlights our ability to deliver precise engineering solutions and efficient execution even under complex high-rise installation conditions.

Year

2025

Construction

Pultruded fiberglass

Water flow

4,000 m³hr

Industry

HVAC