Bromine Compounds

As part of the expansion of the Bromine Compounds plant in Neot Hovav, our company designed, manufactured, and installed a new cross-flow cooling tower, consisting of two cells mounted on a shared concrete basin. In the first phase, one cell was erected, while the second cell will be installed in line with the plant’s expansion schedule. Already at this stage, a dedicated fiberglass cover was installed over the area designated for the future cell — a solution that ensures operational flexibility, optimal use of the existing infrastructure, and smart preparation for future growth.

Year

2025

Construction

Pultruded fiberglass

Water flow

2,500 m³hr

Industry

Chimical