As part of Carmel Olefin’s expansion, YWCT was asked to increase the cooling capacity of both its ethylene and polyethylene plants.

A three-cell structure measuring 12m X 12m per cell was designed for the former, and a two-cell measuring 12m X 12m per cell was designed for the latter.

Year

2006

Construction

Cement, Concrete

Water flow

7,500 m³/hr

Industry

Oil & Gas