Case Studies
Haifa Oil Refinery
The task was to replace a 70-year-old atmospheric cooling tower with a new, more efficient tower.
A two-cell 14m X 14m tower was designed. As part of its deliverables, YWCT provided the refineries with a scale drawing of the concrete cement structure,and detailed drawings of the relevant piping.