Case Studies

Haifa Oil Refinery

Hifa_Oil_Refinery_img_1Hifa_Oil_Refinery_img_2Hifa_Oil_Refinery_img_3Hifa_Oil_Refinery_img_4
Power Power
Oil & Gas Oil & Gas

The task was to replace a 70-year-old atmospheric cooling tower with a new, more efficient tower.

A two-cell 14m X 14m tower was designed. As part of its deliverables, YWCT provided the refineries with a scale drawing of the concrete cement structure,and detailed drawings of the relevant piping.

Year

2006

Construction

Cement, Concrete

Water flow

8,000 m³/hr

Industry

Oil & Gas, Power

LET’S

Stay In Touch

We invite you to ask questions, consult and keep in touch

CLICK HERE