Haifa Oil Refinery
The task was to replace a 70-year-old atmospheric cooling tower with a new, more efficient tower.
A two-cell 14m X 14m tower was designed. As part of its deliverables, YWCT provided the refineries with a scale drawing of the concrete cement structure,and detailed drawings of the relevant piping.
![](/wp-content/uploads/2018/12/year.png)
Year
2006![](/wp-content/uploads/2018/12/construction.png)
Construction
Cement, Concrete![](/wp-content/uploads/2018/12/water-flow.png)
Water flow
8,000 m³/hr![](/wp-content/uploads/2018/12/industries.png)