Intel had to replace old 2000 TR tower which was corroded by the salty air from the Mediterranean. Modular hand-laid FRP towers were designed to fit the exact space on the roof. Replacement took place in two days’ work.
![](/wp-content/uploads/2018/12/year.png)
Year
2009![](/wp-content/uploads/2018/12/construction.png)
Construction
Hand laid FRP![](/wp-content/uploads/2018/12/water-flow.png)
Water flow
1,400 m³/hr![](/wp-content/uploads/2018/12/industries.png)