Case Studies
Intel, Kiryat Gat, Israel
Intel corp was asking to increase the capacity of its cooling towers located in FAB 28, Kiryat Gat (Israel).
YWCT was awarded with this contract after offering a unique configuration that fit perfectly the available foot print on site.
The cooling tower itself met the high, detailed standards of Intel. Installation met the severe safety standards on site.

Year
2021
Construction
Pultruded fiberglass
Water flow
4,700 m³/hr