Linde, Novotroitsk, Rusia

Air Separation Air Separation

Linde, a leading global industrial gases and engineering company, was awarded with a contrac to build an air separation unit (ASU) in Novotroitsk, Rusia. YWCT was selected by Linde as the cooling tower supplier for this project. The solution proposed by our company was an 18mX6m FRPP cooling tower equipped with an integral FRP basin. YWCT designed the cooling tower to the specific needs of Linde’s engineers, provided all local Russian certificates and supplied the components which were sent to this remote site. YWCT sent one of its site managers to supervise the erection which was conducted by a local team. In less than four weeks the cooling tower was installed and ready for action.

Year

2020

Construction

Pultruded FRP

Water flow

1,200 m³/hr

Industry

Air Separation