Nillit – Dry Cooler

As part of the upgrade of the air emission system at Nilit’s facility in Migdal HaEmek, a cooling system capable of operating with exceptionally high-temperature water was required. Since a standard cooling tower is not suitable for these operating conditions, we turned to our strategic partner, Refrion of Italy, and together defined a dedicated air-cooling solution (Dry Cooler). The system was supplied to Meptagon, the project’s EPC contractor, as a complete unit ready for installation.

Year

2023

Construction

Steel

Water flow

200 m³hr

Industry

Chemical