YWCT was asked by Bateman Engineering to design and manufacture a cooling tower for a large gas pumps project in Turkmenistan.
YWCT provided the scale drawings of the concrete basin and the piping accessories. A four-cell HDG tower was designed and built at YWCT’s facility in Ashkelon.
The tower was dismantled and shipped to the job site, where a YWCT team was sent to re-erect it. In three weeks’ time, the tower was up and running