Tech Libary
Case Studies

Find Distributor

Yeshe Water Treatment India pvt ltd & Everest Engineering
+91-251-2874831
W-113, MIDC, Phase-2, Dombivali, Dist – Thane, State- Maharashtra, India
YWCT CIS
+7 495 790-60-55
105120, Moscow, Kostomarovsky Lane, 3, building 3, office 316.
Cappa Cooling
+420 226 230 826
Prague River Garden, CZ - 186 00, Prague 8
Yerushalmi Water Cooling Towers
+972 8 671 8802
+972 8 671 8713
Huzot ha Yozer 30 Ashkelon, 78170, ISRAEL

Archives: Our Projects

ICL, Dead Sea Works Power Plant, Israel

Heavy duty cooling towers were required for the new power plant in ICL Dead Sea Works. Our company designed a multi cell cross flow cooling tower made of pultruded FRP. The cooling towers were deigned and built in modules and then sent to site for fast erection.

Applied Materials, Rehovot, Israel

Our company was selected to replace the old cooling towers in Applied Materials site in Rehovot, Israel. Specifications came from company’s HQ in the US. Cross flow cooling towers were designed to fit the existing foot print. In order to minimize downtime of the systems, dismantling of the old cooling tower and installation of the …

Applied Materials, Rehovot, Israel Read More »

Mekorot, Dovrat, Israel

In order to meet its high quality standards, Mekorot, Israel National Water Co, had to find a solution which will reduce Trihalomethanes level in three of its resorvoirs. YWCT offered Mekorot a volatile organic content removal system (i.e. a degasifier) to solve the problem. Local regulation forced the system to be limited by height (4 …

Mekorot, Dovrat, Israel Read More »

Fibro

YWCT was asked to replace an old cooling tower that was operating

under extremely harsh conditions in a…

Fibro_img_1

Fibro

YWCT was awarded with a replacement contract for an old steel crossflow cooling tower…

Font resize
Contrast