Azriely Center
In order to overcome an air circulation problem, YWCT designed a…
In 1999, YWCT was asked to plan and build a cooling tower for the new terminal at Ben-Gurion Airport (TLV)…
On one of Israel’s tallest buildings, YWCT was asked to replace a 30-year-old cross-flow cooling tower…
As part of this major chemical manufacturer’s expansion, YWCT was invited to…
YWCT was asked by Bateman Engineering to design and manufacture a cooling tower for a…
For the chillers of the Ir Yamim mall – HVAC’s system, a field erected cooling tower was required…
For one of its new production lines, Paz Ashdod Refinery needed a new cooling tower…
A new cooling tower was required for the new power plant at Paz Ashdod refinery…
Wood Group GTS was awarded the contract to build the Dorad 800 MW Power Plant in Ashkelon…