Nesher Power Plant
Nesher is one of Israel’s largest cement manufacturers…
As part of this major chemical manufacturer’s expansion, YWCT was invited to…
YWCT was asked by Bateman Engineering to design and manufacture a cooling tower for a…
For the chillers of the Ir Yamim mall – HVAC’s system, a field erected cooling tower was required…
For one of its new production lines, Paz Ashdod Refinery needed a new cooling tower…
A new cooling tower was required for the new power plant at Paz Ashdod refinery…
Wood Group GTS was awarded the contract to build the Dorad 800 MW Power Plant in Ashkelon…
YWCT was asked to replace an old wooden cross-flow cooling tower which served a power plant in a sugar distillery in India…
High levels of fluoride in the water dictated an extraordinary combination of a draft-force concrete cement tower…
Rotem Amfert asked YWCT to replace an old cooling tower that
had operated for decades in…